Pool digs done properly.
Tight-access pool excavation — concrete, fibreglass or plunge — with spoil removal included. Our 5.5t Takeuchi fits through a 1.5m side gate, so the platform's clean when your pool builder arrives.

What's included
Everything in the one price.
- ✓Excavation to your pool builder's spec sheet (depth, batter, base)
- ✓Tight-access work — 1.5m gates, 5.5t Takeuchi fits
- ✓Spoil removal — carted off, not piled on the lawn
- ✓Drainage gravel base if your spec calls for it
- ✓Clean platform handover — pool builder walks on, not into mud
- ✓Boundary protection for fences, retained gardens and paving
How it goes
From call to finished.
Call or send the form
Tell us the pool size, builder if you have one, and your access situation.
Site walk + spec match
Free, within 5 working days. We measure access, soil and where the spoil goes.
Fixed quote in 24 hrs
Excavation, spoil removal and drainage base all itemised. No "while we're here" surprises.
Dig & hand over
Coordinated with your pool builder's start date. They walk onto a clean platform.
Recent pool digs work


Site during works — TODO_OWNER: after photo of a finished/handed-over pool dig
Get a quote
Tell us about the job.
Fixed written price within 24 hours of the site walk.
Questions
Straight answers.
How tight is "tight access"?
Our 5.5t Takeuchi fits through a 1.5m side gate at the narrowest point. We've done jobs with 1.4m if we pop a panel and reset. If you can fit a wheelie bin through, we can usually get a machine through.
Do you remove the spoil or leave it?
Removal is included in every pool dig quote unless you specifically want the spoil kept for fill elsewhere on site. We own the tipper, so it goes straight from the dig to a local tip.
How long does a pool dig take?
Most concrete pool excavations take 2–3 days including spoil removal. Plunge pools: 1 day. Big concrete or odd-shape digs: up to a week.
Do you work with my pool builder?
Yes — we work with most local pool builders across Hawkesbury, Blue Mountains and Penrith. If yours hasn't worked with us yet, we'll talk to them, get the spec sheet, and coordinate start dates directly.
What if you hit rock?
We check for rock on the site walk and quote with a known rock-or-no-rock assumption. If we hit unexpected rock during the dig, we stop, tell you, and quote the variation in writing before continuing.
How is payment structured?
30% deposit to lock the start date, 70% on completion. Bank transfer or card. Xero invoices.
