Site preparation done properly.
Cut and fill, levelling, compaction, building pads and driveways — finished to ±15mm tolerance and laser-checked, so your slab crew or builder walks onto a platform that's actually ready.

What's included
Everything in the one price.
- ✓Topsoil strip and stockpile — the good dirt kept for landscaping
- ✓Cut to designed depth with surveyor pegs and laser levels
- ✓Fill in lifts with proper compaction, not just dumped and rolled
- ✓Building pad finished to ±15mm tolerance over the whole pad
- ✓Driveway sub-base — road base or DGB to compacted depth
- ✓Cut drains and grade for water so the pad doesn't sit in a puddle
- ✓Compaction testing on request (we'll engage a CET if your builder wants one)
- ✓Tip-clean handover — pegs in, levels confirmed, builder briefed
How it goes
From call to finished.
Call or send the form
Send pad size, builder spec sheet if you have one, and access.
Site walk + level check
Free, within 5 working days. We laser-level the site so the quote is dead-honest on cut volumes.
Fixed quote in 24 hrs
Cut, fill, compaction, sub-base, drains and tip fees — every line itemised.
We prep & hand over
Pad finished to ±15mm. Slab crew or builder walks onto a platform that's actually ready.
Recent site prep work


Cut, fill and pad — from bulk earthworks to a finished platform
Site preparation by area
Get a quote
Tell us about the job.
Fixed written price within 24 hours of the site walk.
Questions
Straight answers.
What tolerance do you finish a pad to?
±15mm over the whole pad, laser-checked. Most slab crews are happy with ±25mm — we go tighter because it makes their day easier and the slab pour cleaner.
Do you do compaction testing?
On request. We engage an independent CET (Compaction Engineer/Testing) who certifies the pad in writing. Most domestic pads don't need formal testing, but if your builder or insurer asks, we'll arrange it.
How long does pad prep take?
A standard 200m² house pad on flat ground: 2–3 days. A sloped block with cut and fill: 4–7 days. A granny flat or shed pad: 1–2 days.
Do you handle the spoil?
Yes. We own a tipper and know the local tip rates. If the cut produces clean fill you want to keep on site, we'll re-use it before paying a tip fee.
What if my builder wants to do the prep themselves?
Fine — but get it in writing what they're including. We'd rather hand you a clean pad and let the builder build than mop up at the slab pour.
What insurance do you carry?
$20m public liability with NTI, plus workers compensation through Allianz. Certificates available on request.
