Retaining walls done properly.
Sandstone block, besser block, concrete sleeper and link-block walls with engineered drainage, built by the crew that quoted them. Certified over 1 m.

What's included
Everything in the one price.
- ✓Site walk and fixed written price within 24 hours
- ✓Excavation and compacted roadbase footing
- ✓Ag-line drainage and free-draining backfill
- ✓Engineer's certification for walls over 1 m
- ✓Block grab on our own excavator for 1.4 t sandstone blocks
- ✓Spoil removed, site raked, gates shut
How it goes
From call to finished.
Walk the site
Jesse measures the run, checks fall, soil and access, and talks through block choice on the spot.
One written price
Excavation, footings, blocks, drainage, delivery and clean-up in one number that doesn't move.
Build it once
Laser-levelled footing, string-lined courses, ag-line behind every course that needs it.
Sign it off
Jesse walks the finished wall before you're asked to. Pressure-washed, spoil gone.
Recent retaining walls work


Timber replaced with sandstone


Two-tier driveway wall
Recent stories
Kenthurst site cut and two-tier sandstone retaining wall
Three weeks in Kenthurst: a site cut for a truck-sized car park around the shed, then a two-tier A-grade sandstone wall with full drainage, gravel and turf.
Two-tier sandstone driveway wall in Kurrajong
A bare, sloping driveway edge became a two-tier A-grade sandstone wall with a lawn terrace on top.
Timber wall replaced with sandstone in Richmond
Forty years of leaning sleepers out in a morning; two courses of A-grade sandstone in.
Get a quote
Tell us about the job.
Fixed written price within 24 hours of the site walk.
Questions
Straight answers.
How much does a sandstone retaining wall cost?
Sandstone block retaining wall costs in the Hawkesbury typically range from $300 to $600 per lineal metre depending on wall height, access, soil conditions, and whether A Grade or B Grade blocks are used. Our quotes are fixed-price and fully inclusive: excavation, footings, blocks, drainage, labour, equipment, and clean-up. Call Jesse on 0432 085 976 for a free site visit and written quote.
Do I need council approval or an engineer?
Anything over 1m in finished height needs engineer sign-off in NSW. We work with engineers we trust and usually coordinate the certification directly. For council CC paperwork we'll point you to a consultant we've worked with — they handle the lodgement, we handle the build.
Sandstone, besser or sleeper — which should I choose?
Sandstone block is our most popular finish — hand-laid, set in mortar with a fully drained back face, and it looks better the more it weathers. Besser block and link-block suit engineered jobs and driveway walls behind a render or stone face, with full reo and core-fill. Treated pine and hardwood sleeper suits a tighter budget, built on galvanised posts in concrete footings rather than bargain-bin steel.
How long does a wall job take?
A 4–6m garden wall typically takes 2–3 days. A two-tier driveway wall takes 1–2 weeks. A full property terracing job takes 3–4 weeks. We give you a calendar at quote-time.
